Construction site
Charge electric excavators and construction machinery where only a site power connection is available.
Storage and 600 kW fast charging in a 10-foot container. It charges from the existing connection and delivers the energy within a short time to electric trucks, buses, snow groomers and construction machinery.

Charge electric excavators and construction machinery where only a site power connection is available.
Charge at the valley station during the day, supply the grooming fleet at night. No grid upgrade on the mountain.
Bridge the time until the grid upgrade or absorb peak loads in the depot.
Charge electric trucks with up to 400 kW at one charging point: in the yard, at the loading dock, in the transshipment warehouse.
The container buffers energy from an ordinary connection and delivers it as a charging peak. There is no need for an expensive grid upgrade.
From the existing connection: from CEE 32 A up to 2× CEE 125 A with a combined 160 kW of alternating current (AC). Or directly into the storage via the DC input (CCS2) with up to 340 kW.
1,254 kWh in six battery clusters with LFP cells. Liquid-cooled, with aerosol fire suppression at pack and room level.
Two DC charging points with 400 kW and 200 kW, liquid-cooled cables, 300–1000 V. Plus a CEE 125 A AC output with 80 kW for machinery and site power.

Vehicles charge directly from the storage, without a detour via the inverter.
From a CEE 32 site power socket up to 2× CEE 125 A: the container charges from whatever connection is available on site.
Storage, CCS2 charging station and CEE connections in a 10-foot container: 1,254 kWh on approx. 7.3 m². Transport by hook-lift truck or crane.
Remote monitoring around the clock. Commissioning and service by partners in Switzerland.
For operators with permanent demand. The storage becomes part of your facility and is depreciated over its service life.
Financing through your bank: a predictable monthly instalment instead of an investment. Your capital stays in your core business.
For construction projects, seasonal operations and the time until the grid upgrade. Days, months or years.
The first systems arrive in Switzerland in winter 2026/27. Terms on request.
Tell us your location, vehicles and charging times. We calculate whether and how the container pays off for you.
Reply within two working days.